Client:
Well known Company in the Beverage Industry
Industry:
Beverages
Localization:
Brașov, Romania
Year:
2023-2024
Category:
Process Engineering
Project Manager:
Adriana Stoian
Group companies involved:
RAPTRONIC PROCESS ENGINEERING
Challenges of #Team RAP
Constraints:
The introduction of a fully manufactured tank through the roof or access routes was impossible due to the tank’s dimensions (2.5x6m).
The cutting and removal of the deformed tank from the building was carried out without impacting production.