Central emergency stop system for a production line

Supplying a central emergency stop system for a production line to be installed in Sweden.
#IndustrialProject, #ProcessEngineering, #ProjectManagement

Specifications

Client:
A renowned producer in the chocolate industry

Industry:
Food

Location:
Sweden

Year:
2024

Category:
Industrial Project/ Process Engineering and Project Management

Project Manager:
Adrian Suciu

Group companies involved:
RAPTRONIC PROCESS ENGINEERING

Project description

  • Upgrade of the existing electrical cabinet (with relocation)
  • Safety PLC (Complete system must fulfill safety level PLd )
  • Upgrade of existing HMI
  • Complete pull-wire system (approximately 6 new wires to be considered)
  • Connection and signal exchange to equipment in the JEET line (18 control systems)
  • Connection and signal exchange between E-stop cabinet and SCADA
  • Install safe air exhausts (together with clean air filters) for releasing pressure in the system (1x pack area, 1x process area, 1x molding

 

Challenges of #Team RAP

“The greatest challenge was installing the new system and integrating it with the existing system without disrupting production continuity.“

Adrian Suciu – Project Manager

 

Project Insights

  • This was made possible by preparing the connections in advance.
  • For this, RAP Tronic Process Engineering sent a team a few weeks before the installation, and the moment of making the connections was chosen during one of the maintenance breaks of the existing line.
  • Thus, in a record time, the existing line could be integrated into the new E-Stop system.