Client: Relevant Player in Food Industry
Industry: Food
Location: Brașov and Câmpia Turzii
Year/Duration: 2024-2025; 3 months
Category: Assembly and installation of skids
Project Manager: Adriana Stoian
Group companies Involved: RAP Therm – execution of the copper skids
The fabrication of the skids was carried out at the RAP Tronic Process Engineering workshop, while the connection was made at the client’s site.
The engineering process involved intricate design drawings tailored to the client’s requirements. One of the skid components is made of copper and was manufactured using silver alloy brazing and threaded joints.
The stainless-steel skids were tested at a pressure of 130 bar to ensure safety and compliance with technical specifications. The success of the project was largely due to the exceptional skills of the welder, who managed to complete the connection welds in an extremely confined space, overcoming major constraints imposed by the location.
Challenges of #TeamRAP