Installation of 2 stainless steel tanks of 20 m³ for storing egg mixture

Complete construction of the necessary system for operation

Implementation of automation

  • Tank design (hygienic design)
  • Installation design
  • Cooling system and product maintenance at a maximum of 4°C
  • Tanker unloading station
  • Electrical installation and automation
  • Equipment procurement and installation
  • Insulations
#Industrial Project, #Process Engineering, #Project Management

Specifications

Client:
A renowned producer in the chocolate industry

Industry:
Food

Localization:
France

Year:
2023

Category:
Industrial Project/ Process Engineering and Project Management

Project Manager:
Elena Tătărusanu

Group companies involved:
RAPTRONIC PROCESS ENGINEERING

Project description

Egg tanks 20 m³- 2 pcs
(selection of products and services)

  • Temperature management of maintaining the product at fixed temp in every weather condition;
    • Blade agitator for homogeneous mixing
    • Hygienic design (EHEDG)
    • All parts in contact with the product AISI 316 and non-contact product parts AISI 304;
    • Dimple jacket with water circulation,
    • Insulation: 100 mm Rockwool with AISI 304 stainless steel cladding for canopy, tank and skirt;
    • Aluminum platform connection between the two tanks with cat ladder access.
    • Equipped with temperature, level, and pressure level sensors;
    • CIP design
  • Temperature management unit
  • Ensures constant temperature year round using exiting hot and cold water resources.
  • Automation system
    • Dedicated PLC, integrated with the exiting automation system.

 

Project Management & Design:

  • Dedicated Project management for the entire project.
  • Process design including P&ID, 2D 3D CAD layout, pipe isometry
  • On-site visit for measurements and final scope clarification
  • Documentation and translation
  • Sizing calculation of the transfer system.

 

Project challenges on site:

  • Cooling and maintaining the product at a maximum temperature of 4°C
  • Hard-to-access areas for product pipelines (pipe routing)
  • Inserting equipment into assembly areas through very narrow spaces
  • Designing and constructing the platform between the two tanks, considering the tall height and narrow width of the platform