Installation of 2 stainless steel tanks of 20 m³ for storing egg mixture
Complete construction of the necessary system for operation Implementation of automation
- Tank design (hygienic design)
- Installation design
- Cooling system and product maintenance at a maximum of 4°C
- Tanker unloading station
- Electrical installation and automation
- Equipment procurement and installation
- Insulations
#Industrial Project, #Process Engineering, #Project Management