Heat pumps

Installation of heat pumps and cooling units for the utilities plant, essential for operating one of the largest confectionery factories in Europe (in terms of production capacity). The project included the design, positioning of equipment, execution, installation of connections, and integration of pumping systems into the existing utility distribution network (heating and cooling).
#HeatPumps #EnergyEfficiency #CoolingUnits #IndustrialProject #ThermalSystems #SustainableTechnology #KeyProjects #SustainableDevelopment #Energy Efficient #Project Management #QualityEngineering

Specifications

Client:
Relevant player in food industry

Industry:
Food, Confectionery

Location:
Sweden

Year/Duration:
2024

Category:
Process Engineering Installations

Project Manager:
A. Fodor

Project description

Main works performed

  • Design and sizing of the required equipment, tailored to the specific needs of the factory.
  • Installation of 3 high-capacity heat pumps to optimize energy efficiency.
  • Installation of 2 cooling units to support industrial processes.
  • Sizing and installation of pumps for glycol and water circulation, ensuring optimal operation of the equipment.
  • Implementation of a refrigerant leak detection system, in compliance with Swedish regulations and standards.
  • Installation of systems for controlled collection and disposal of refrigerants, meeting safety and environmental protection requirements.
  • Integration of the new equipment into the existing utility network, without significant interruptions to production processes.

Challenges on the jobsite

Integration of the new equipment into the existing utility network, without significant interruptions to production processes.